THERMAL POWER PLANT “BITOLA”

  • Diagnostics and upgrading of the cooling system of transformer 25 MVA, 15.75/6.3 kV;
  • Diagnostics of transformer 250 MVA, 400/15.75 kV;
  • Capital repair and upgrading of cooling system of transformer 250 MVA, 110/15.75 kV with increasing the power by 10% .

III) On the territory of Egypt:

Substation “RIFA”

  • Diagnostics and repair of transformer 75 MVA, 220kV.

IV) On the territory of Lebanon: